MAS readiness assessment
Current-state analysis of customisations, integrations, BIRT reports, automation scripts and licensing. Deliverable: a board-ready answer in 4–6 weeks covering cost, risk, timeline and architecture options.
IBM Maximo 7.6 end-of-support is approaching. Valueztech is an Australian IBM Silver Business Partner and Maximo service provider delivering Maximo upgrade and migration programmes from 7.6 to Maximo Application Suite (MAS 9) on Red Hat OpenShift — on premises, AWS ROSA or IBM Cloud.
Request a Maximo upgrade assessmentMigrating to Maximo Application Suite (MAS 9) is more than a version upgrade — it is a re-platforming onto Red Hat OpenShift with a new licensing model, new architecture and new integration patterns. Boards and CIOs are asking: “What is the plan for Maximo?” Valueztech delivers the board-ready answer.
Current-state analysis of customisations, integrations, BIRT reports, automation scripts and licensing. Deliverable: a board-ready answer in 4–6 weeks covering cost, risk, timeline and architecture options.
On-premise OpenShift, AWS ROSA, IBM Cloud or fully-managed SaaS — with TCO modelling. Valueztech's open-source mas-sno-aws-installer accelerates SNO-on-AWS proof-of-concepts.
Keep, refactor or retire every customisation based on actual usage data, not assumptions. Reduces migration scope, testing effort and ongoing support cost.
Phased data migration with validation gates. ERP, GIS and field-system integrations rebuilt for MAS REST and OSLC patterns.
Automated regression suites built once and run before every patch, upgrade milestone and go-live. Integration test coverage spans Maximo, ERP and field systems.
Parallel running, dual-write integration patterns and rollback options. 90-day post-go-live stabilisation with onshore Australian consultants.
Victorian water utility
Maximo 7.6 to MAS 9 delivery programme for a major water authority.
Chocolate manufacturer
Maximo 7.6 to 8.9 upgrade for a global food and beverage operator.
Open-source tooling
Author of mas-sno-aws-installer on GitHub for MAS-on-AWS proof-of-concepts.
IBM credentials
IBM Silver Business Partner led by an IBM Champion (2022–2026).
Common questions about Maximo 7.6 end-of-support, MAS 9 migration and upgrade services in Australia.